Gascoyne Resources

Dalgaranga Gold Project


 

The combined Measured, Indicated and Infered Mineral Resource for the Dalgaranga Project stands at 29.6Mt @ 1.3g/t Au for 1,230,000 ounces of contained gold.

 

 

 

Dalgaranga Deposits

Mineral Resource Estimate March 2017

 

Measured

Indicated

Inferred

Total

Type

tonnes

Au

Au

tonnes

Au

Au

tonnes

Au

Au

tonnes

Au

Au

 

Mt

g/t

Ounces

Mt

g/t

Ounces

Mt

g/t

Ounces

Mt

g/t

Ounces

Laterite

 

 

 

0.5

1.1

17,000

0.1

0.8

3,000

0.6

1.1

20,000

Oxide

0.2

1.6

8,000

1.6

1.6

83,000

0.8

1.3

35,000

2.6

1.5

130,000

Transitional

0.5

2.1

30,000

1.0

1.5

49,000

0.5

1.5

22,000

1.9

1.6

100,000

Fresh

2.2

1.4

94,000

11.9

1.2

472,000

10.4

1.2

413,000

24.5

1.2

980,000

Total

2.8

1.5

133,000

15.0

1.3

622,000

11.8

1.2

472,000

29.6

1.3

1,230,000

Note: Totals may differ due to rounding, Mineral Resources reported on a dry basis Gilbeys Resource – March 2017 (0.5g/t cut-off)

 

 

Dalgaranga Deposits
Ore Reserves November 2016

Ore Reserves

Tonnes
(M tonnes)

Gold Grade
(g/t)

Contained ounces
(oz)

Proven

3.1

1.28

129,000

Probable

10.2

1.29

423,000

Ore Reserves Total

13.3

1.29

552,000